All the action has been inside over the past week or two, because that's where the paint crew is focusing and also because of crappy weather. However, yesterday (03.20) the utility contractor ran a gas line from to the house. The meter isn't installed yet, however.
Looking right down the line (the little yellow flags).
o hai house
There's the gas line stub, waiting for the regulator/meter thingy to be installed.
Oooo, stair parts!! I see pickets (balusters), oak treads, and in the three boxes on the left are the newel posts.
ORB railing brackets. They're nice looking. Another seemingly insignificant item that was carefully spec'd by our "always sweat the small stuff" GC!
And we even selected our carpet today (Saturday 03.22). The swatch on the end is called "Cloudland" and it'll look (and feel) really nice in the bedrooms.