So to speak. ;-P First load of framing lumber and subfloor panels (and associated hardware/accessories) arrived some time in the morning of Monday, Oct 21. I was excited to see the bundle of AdvanTech flooring panels; this stuff is top of the line. Can't beat a stick-built house!
Whoever delivered this stuff was very neat and orderly!
No comments:
Post a Comment