Tuesday, October 8, 2013

Gained our footing.

On Oct 2, the footings were poured.  Three loads (about 27 cubic yards total) of 2500 PSI mix were required to fill all of the excavated areas.

 Love the snazzy optic-yellow drum!  Dude driving the mixer looked like a member of ZZ Top.


No comments:

Post a Comment