Tuesday, February 11, 2014

Flooring extravaganza.

Interior and exterior flooring is going down at a rapid rate.  Siding ground to a halt after Saturday (02.08) due to snotty weather.

Screened porch floor started.

It's classic porch material - tongue & groove makes it so.

Here's the beginning of the upstairs hallway oak.

Nice double bullnose trimmer.

A peek into the powder room.





Can't wait to see the built-in bookshelves that'll go into that opening under the stairs.

Coat closet.

There's another one of those gorgeous oak floor registers.

Front porch is complete!  Well, except for trim out, that is.

The posts will be encased in 8" wide planks of MiraTEC, and collars will then be fastened top & bottom.  It'll be a nice chunky "shaker" look, in keeping with the style of the house.

I took this shot from right about where our porch swing will eventually hang.

This shit appeared earlier today (this is at the rental shack, not at the build site).  Supposed to be nasty for the next 2-3 days.  Hopefully by Friday the siding crew can get back at it.

No comments:

Post a Comment