Sunday, February 16, 2014

Details.

Justin the cabinet installer was busy all day, and we are so grateful and impressed.  He installed all of the crown molding, the light rail, and the toe kick.  Impeccable work.

All of the doors and drawer faces are built, but they need some time on the drum sander and then a coat of primer.  Should be painting everything by middle of the week.

More drawers put in place.

I cannot properly express how impressed and pleased I am with the quality of the materials and the workmanship.  The maple veneer interiors are flawless.

Some crown detail.

And some light rail detail.

My dream island.  Large and perfectly laid out for prep work and cleanup efficiency.  From right to left...dishwasher pocket; sink base; trash/recycling pullout with drawer above; and 3-drawer stack.



4 ft x 9 ft island!  Woot!!

The outer island bases will contain a couple of shelves each, which is great added storage.



Justin the installer remarked that "it's not a big kitchen, but it's huge."  That is a high compliment coming from a cabinet pro!  It certainly does "play" bigger than it looks.

No comments:

Post a Comment