Tuesday, December 24, 2013

Random stuff.

As of last Friday, the trades had completed all rough-ins and everything passed inspection (HVAC, electrical, plumbing, well, and septic).  Drywalling will begin during/after the holiday weeks, and will be completed about two weeks later.  I presume some or all of the millwork will happen at the same time.  Flooring will also begin soon - tiled areas first, then wood.  Doug from the carpet store came out on Saturday (12.21) and measured the bedrooms.  All interior doors and the breathtaking mahogany front door have been ordered, as were the two garage doors.

Here are some random pics of stuff from recent life.

My baby boy's beautiful, magical ears.  I love him so very much.

Homemade pepperoni & green olive 'za from last Friday evening.

Excellent old Chevy pickups at Auto Investors down in Dothan, AL.

Couple of tasty sushi rolls I enjoyed during my recent trip to S Florida.

Totally choice Chevy II, also at Auto Investors.  LOL @ the microbus!

No comments:

Post a Comment